Comments on: Verification of rig power systems critical in software testing /verification-of-rig-power-systems-critical-in-software-testing-30698 Get the latest oil drilling news with Èý•NÌåÓý Mon, 03 Nov 2014 07:23:39 +0000 hourly 1 https://wordpress.org/?v=6.1.1 By: Kartikey /verification-of-rig-power-systems-critical-in-software-testing-30698#comment-86362 Mon, 03 Nov 2014 07:23:39 +0000 https://live-drillingcontractor-org.pantheonsite.io/?p=30698#comment-86362 In deed it is good article. The problem of high demand power for Thruster and Draw works can be eliminated with Ultra capacitor banks.
Ofcourse it will little increase the complexity of system , however it is justifiable against the complete black out or limitation in drilling operation.
The slowest device in power measurment chain are analouge relay which take longer time ..do we have faster relay available in market?

]]>