Comments on: Fuel consumption, overload capacity among critical criteria in selection of generator sets /fuel-consumption-overload-capacity-among-critical-criteria-in-selection-of-generator-sets-6864 Get the latest oil drilling news with Èý•NÌåÓý Thu, 10 Jul 2014 01:32:33 +0000 hourly 1 https://wordpress.org/?v=6.1.1 By: Mr. Kwon /fuel-consumption-overload-capacity-among-critical-criteria-in-selection-of-generator-sets-6864#comment-62946 Thu, 10 Jul 2014 01:32:33 +0000 https://live-drillingcontractor-org.pantheonsite.io/?p=6864#comment-62946 Hi Sir.
It`s nice to meet you.

We are ACE Plantech in south Korea.
First, thank you for your analysis of Drilling rig and its related articles above

We, ACE Plantech Co., Ltd., are a leading company which is exporting and importing various machinery equipment, chemical and its related parts.

so, we are now searching the supplier or manufacturers of spare parts of [AC SCR drilling rig (Mitsubishi electric corporation made)]. would you mind informing me the supplier of factory, company ?

sorry for inconvenien caused you and waiting answer

Thank you

]]>
By: Joe Hanson /fuel-consumption-overload-capacity-among-critical-criteria-in-selection-of-generator-sets-6864#comment-523 Thu, 23 Sep 2010 20:07:57 +0000 https://live-drillingcontractor-org.pantheonsite.io/?p=6864#comment-523 The very best choice in designing or upgrading drilling rigs is to power the rig with VFD drives. The use of these drives using AC motors are by far a better choice due to the power factor these systems operate. This makes the complete system for superior to a SCR or DC/DC system, no damage due to stalls and less maintenance (no brushes) in AC motors.

]]>